var _iub = _iub || []; _iub.csConfiguration = {"siteId":4060419,"cookiePolicyId":81346056,"lang":"en","storage":{"useSiteId":true}};

How to Get an Accurate Construction Estimate?

How to Get an Accurate Construction Estimate?

Chloe

One question I hear from nearly every homeowner is:

“How much will it cost to build my house?”

It sounds simple, but the answer depends on how prepared you are. Builders aren’t trying to be vague on purpose—pricing a custom home is impossible without clear information. In this post, I’ll explain what documents, decisions, and planning you need before asking for a reliable estimate.

Why Builders Need More Than Just a Floor Plan

Many homeowners approach a contractor with something like:

“I want to build a 3-bedroom modern house with high ceilings—how much will it cost?”

But that one sentence doesn’t give nearly enough information to define the scope of work. Without detailed plans or decisions, you’re likely to get one of three responses:

  • A very broad estimate
  • A high-ball number padded for risk
  • No answer at all

To get a reliable number, you need four critical pieces of information—outlined in professional contracts used across the construction industry.

The 4 Essential Documents You Need (From AIA Standards)

We use the AIA’s General Conditions document as a reference. AIA stands for the American Institute of Architects, which creates standardized construction contracts based on decades of legal and field experience. You can purchase their contract documents here:

👉 https://shop.aiacontracts.com/

According to AIA standards, a complete construction scope includes:

The Work

This defines what the contractor and their subcontractors are responsible for, including labor, equipment, and materials.

The Drawings

These are the architectural plans that show the layout, elevations, sections, dimensions, and details.Typical plan set includes: site plan, floor plan, elevations, wall sections, and interior details.

The Specifications

Written instructions for the materials and systems to be used.

For example:

  • Asphalt shingles vs. metal roofing
  • Wall-mounted toilet vs. floor-mounted
  • Thermally broken windows vs. standard aluminum frames

These decisions directly impact pricing and scheduling.

The Instruments of Service

All visual and conceptual materials prepared by the architect or designer to explain the intent of the building—renderings, 3D models, sketches, notes, etc.

Building in 3D is a visual language. Plans alone may not capture everything, especially in custom designs with complex geometry.

Why These Materials Matter (for You and Your Builder)

When you go out for bidding, the level of detail you provide determines how accurate the quotes will be.

Example:

A client provides full plans, specs, and design intent for a 2,500 sq ft home. One contractor prices it at $275/sq ft. Another offers $285. The numbers are close.

Another client only gives a mood board and says, “Something modern with vaulted ceilings.” The estimates range from $250–$450/sq ft.

The more decisions you make upfront, the fewer surprises you’ll face later.

Why Hire a Local Architect?

Even if you buy pre-designed plans, we always recommend working with a local architect. Here’s why:

  • They understand local building codes, permitting, and soil conditions.
  • They can act as the initial decision-maker in disputes between client and contractor (a role defined in AIA contracts).
  • They can catch issues before construction—like incorrect window heights or missing structural details.

What Are Allowances?

Not every product decision is made up front—some things (like lighting, appliances, or tile) are selected late in the project.

Allowances are placeholder dollar values written into the contractor’s bid. For example:

  • Tile: $8/sq ft
  • Refrigerator: $3,000/unit

Make sure these values align with your expectations—or you’ll face upcharges later.

Why You Need a Construction Schedule

Most residential builders give rough timeframes like “12 months” or “18 months,” but delays happen—especially when projects lack clear scheduling.

The AIA contract format includes a requirement for:

  • Construction start date
  • Milestone dates
  • Estimated completion

Even for residential jobs, this structure helps clients track progress and identify issues early.

Contracts Protect the Builder, Too

This isn’t just for homeowners—AIA-style contracts benefit contractors as well. They:

  • Define payment schedules and deadlines
  • Clarify the change order process
  • Require the owner to carry appropriate insurance coverage

What About Delays and Lost Income?

AIA contracts include a waiver of consequential damages. This protects the builder if, for example, a vacation rental is delayed and misses the peak season. The contractor isn’t liable for lost profits.

There’s a famous case where a casino opened late and tried to sue the builder for missed revenue. The court upheld the waiver in the contract.

Final Takeaway

Getting a construction estimate isn’t just about square footage or style.

It’s about preparation.

If you want a real number—and a smooth build—come to your contractor with:

  • A full set of drawings
  • Clear product specs
  • Visual references for design intent
  • Defined scope of work

Want to go deeper?

Check out the AIA residential contract templates here:

👉 https://shop.aiacontracts.com/contract-documents/6406765-owner-contractor-custom-residential

What it is

AIA Document A110–2021 is a stand-alone agreement with its own internal general conditions and is intended for use on custom residential construction projects. A110 may be used for custom residential projects where payment is based on either a stipulated sum or the cost of the work plus a fee, with or without a guaranteed maximum price. Parties using AIA Document A110–2021 will also use A110 Exhibit A, Determination of the Cost of the Work, if using a cost-plus payment method.

More Journals